News Archive – PT Merdeka Copper Gold Tbk Menjadi industri penghasil emas, perak, tembaga, dan mineral lainnya yang terkemuka di Indonesia Wed, 18 Mar 2026 09:46:37 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 Merdeka Group’s Ramadan Safari: Strengthening Community Bonds Across Operational Areas https://merdekacoppergold.com/en/merdeka-groups-ramadan-safari-strengthening-community-bonds-across-operational-areas/ Wed, 18 Mar 2026 09:26:48 +0000 https://merdekacoppergold.com/?p=29309 Ramadan brings a different rhythm to communities surrounding mining operations. As dusk approaches, activities slow down and residents gather at mosques or village halls. In these moments, several entities within the Merdeka Group engage through a series of Ramadan Safari programs—ranging from village visits and communal prayers to iftar gatherings and youth-focused initiatives—held throughout the […]

Artikel Merdeka Group’s Ramadan Safari: Strengthening Community Bonds Across Operational Areas pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Ramadan brings a different rhythm to communities surrounding mining operations. As dusk approaches, activities slow down and residents gather at mosques or village halls. In these moments, several entities within the Merdeka Group engage through a series of Ramadan Safari programs—ranging from village visits and communal prayers to iftar gatherings and youth-focused initiatives—held throughout the holy month across various operational areas.
*

Ramadan Safari in Routa
In Southeast Sulawesi, PT Sulawesi Cahaya Mineral (SCM) launched its 1447 H Ramadan Safari by visiting villages and sub-districts around its Routa mining area in Konawe.From February 22 to March 8, 2026, this annual program was once again welcomed by local communities. Each afternoon before iftar, representatives from various company departments, contractor partners, and SCM’s Head of Mining Engineering gathered at mosques or village halls. Together with residents, they broke the fast, listened to religious sermons, and engaged in informal conversations with community leaders.

The series began in Lalomerui Village, the closest to SCM’s mining site, and marked an important milestone with the inauguration of the newly renovated Al-Qautsar Mosque, fully supported by SCM.

“With the completion of this renovation, we hope the community can perform their worship more comfortably,” said Lalomerui Village Head, Taksir Unggahi.

The Ramadan Safari also fostered warm interactions, including through the “Anak Saleh” educational quiz. Children participated enthusiastically, offering candid answers that often drew laughter. Mothers accompanying them were occasionally invited to join as well.

As part of the program, SCM’s Community Affairs team and contractor partners distributed more than 350 Ramadan care packages to underprivileged households. These were symbolically handed over to village authorities for distribution.

“Through the Ramadan Safari and these donations, SCM hopes to further strengthen community ties,” said SCM Head of Mining Engineering, Didik Fotunadi. “Direct engagement and positive interactions form the foundation of a harmonious relationship between the company and the community.”
*

*
Engaging Youth in Halmahera
A similar sense of togetherness was seen in Central Halmahera, North Maluku. Here, PT Merdeka Tsingshan Indonesia (MTI) held Ramadan Safari events on February 27, 2026, at Babussalam Mosque in Makarti Jaya Village, and on February 28 at Ar-Rahman Mosque in Labota Village. Activities began before iftar with religious sermons, followed by communal breaking of the fast and prayers.

Beyond religious observances, MTI’s Ramadan Safari created space for youth engagement. In collaboration with Makarti Jaya Village-Owned Enterprise (BUMDes), the company organized religious competitions involving students from ten local Qur’anic learning centers. Events ranged from archery and short surah memorization to young preacher contests, adhan, quiz competitions, and Ramadan vlogging. These activities encouraged both religious understanding and creativity among village youth.


*

Ramadan Fair at Tujuh Bukit
In Banyuwangi, East Java, PT Bumi Suksesindo (BSI) introduced a different approach through Ramadan Fair 2026, involving 56 students from seven high schools in Pesanggaran and Siliragung districts.

Held every weekend since February 27, 2026, the program combined Islamic boarding-style activities with educational sessions. Days were filled with communal worship, followed by tarawih prayers and Qur’an recitation in the evenings. Participants also explored topics relevant to youth, such as the risks of early marriage and drug abuse.

They also received social media content training and joined a mine tour at the Tujuh Bukit Gold Mine.

“Mining is something we usually only see from the outside. Now I can see it firsthand,” said Raya, a participant from SMK PGRI Pesanggaran.

As part of the program, BSI held “Bumi Suksesindo Bersholawat” on March 7, 2026, at Tujuh Bukit Futsal Stadium, attended by hundreds of employees and student participants. The event also included donations to local orphans.

A dedicated session for female employees, titled “Resilient Women Welcoming Ramadan,” focused on practical topics such as emotional awareness and mental resilience in a demanding work environment.


*

Extended Safari and Ramadan Market in Pohuwato
In Gorontalo Province, the Pani Gold Mine conducted an extensive Ramadan Safari from February 23 to March 19, 2026. A total of 29 events were held across villages and hamlets, in collaboration with mosque committees and involving multiple company departments.

Each visit included iftar gatherings, religious talks, and congregational prayers, reaching areas such as Hulawa, Taluduyunu, Buntulia, Bulangita, and Palopo. Activities were also regularly held at Baiturrahim Grand Mosque, including a large iftar event at Pohuwato Grand Mosque attended by local government and the public. Cooking oil was distributed at each event as direct support to residents.

“We are impressed by the community’s enthusiasm. Their warm responds gives positive energy to the company,” said Mahesha Lugiana, CSR Manager of Pani Gold Mine.

The program concluded with a Ramadan Market held in Buntulia and Marisa districts. Hundreds of residents accessed subsidized staple packages—worth Rp200,000 but redeemable at Rp50,000—to help meet household needs ahead of Eid. The initiative also reached traditional miners in collaboration with Pohuwato Police.

Through the combination of Ramadan Safari and the Ramadan Market, Pani Gold Mine delivered both social engagement and tangible economic support to surrounding communities.

*

Ramadan activities across Merdeka Group’s
mining areas may vary, but all are tailored to local needs and cultural contexts. Through sustained interaction and engagement, Ramadan Safari goes beyond religious observance. It creates shared spaces that strengthen communication and trust between the company and the communities it operates in.

 

Artikel Merdeka Group’s Ramadan Safari: Strengthening Community Bonds Across Operational Areas pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
MDKA and EMAS Sign Gold Sales and Purchase Agreement with ANTAM https://merdekacoppergold.com/en/mdka-and-emas-sign-gold-sales-and-purchase-agreement-with-antam/ Thu, 05 Mar 2026 04:26:15 +0000 https://merdekacoppergold.com/?p=29266 PT Merdeka Copper Gold Tbk (IDX: MDKA), through its subsidiary PT Bumi Suksesindo (BSI), and PT Merdeka Gold Resources Tbk (IDX: EMAS), through PT Puncak Emas Tani Sejahtera (PETS), have signed a Gold Sales and Purchase Agreement (GSPA) with PT Aneka Tambang (Persero) Tbk (ANTAM). The agreement was signed on 4 March 2026 at The […]

Artikel MDKA and EMAS Sign Gold Sales and Purchase Agreement with ANTAM pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
PT Merdeka Copper Gold Tbk (IDX: MDKA), through its subsidiary PT Bumi Suksesindo (BSI), and PT Merdeka Gold Resources Tbk (IDX: EMAS), through PT Puncak Emas Tani Sejahtera (PETS), have signed a Gold Sales and Purchase Agreement (GSPA) with PT Aneka Tambang (Persero) Tbk (ANTAM). The agreement was signed on 4 March 2026 at The Darmawangsa Hotel in South Jakarta.

The agreement is valid for two years with a total transaction volume of 3 metric tons (nearly 100,000 ounces of gold per year), with an option to increase by up to 3 additional metric tons per year. Under this partnership, BSI and PETS act as the sellers, while ANTAM serves as the buyer of domestically refined gold granules.

The gold production covered under this agreement comes from two of Merdeka Group’s key operations: the Tujuh Bukit Gold Mine in Banyuwangi, East Java, operated since 2017 by BSI, and the Pani Gold Mine in Pohuwato, Gorontalo, operated in part by PETS.

The Pani Gold Mine is the Group’s newest operation. The mine commenced first mining in October 2025 and successfully achieved its first gold pour on 14 February 2026 through the heap leach process. On 27 February 2026, the mine also delivered 44.04 kilograms of dore bullion to ANTAM for its first refining process. The first sale of refined gold under the GSPA is targeted to take place before the end of March 2026.

President Director of PT Merdeka Copper Gold Tbk, Albert Saputro, stated that the partnership represents a strategic step to ensure domestic absorption of the Group’s gold production while strengthening the integration of Indonesia’s gold industry supply chain. “With a growing production base from the Tujuh Bukit and Pani gold mines, we need a stable and measurable offtake structure. This GSPA provides certainty for production offtake while reinforcing our contribution to the domestic gold industry,” said Albert.

ANTAM Commercial Director Handi Sutanto added that the partnership reflects stronger national gold sovereignty, where Indonesia’s mined resources are refined into pure gold products accessible to the public. ANTAM’s gold bar products are accredited by the London Bullion Market Association (LBMA). Through this collaboration, the integration of Indonesia’s gold supply chain is expected to become even stronger.

Going forward, with an increasingly solid production base from the Tujuh Bukit and Pani gold mines and the support of strategic partnerships, Merdeka Group remains optimistic about further increasing its contribution to Indonesia’s gold industry.


Main photo: Representatives of MDKA, EMAS, and ANTAM during the agreement signing on 4 March 2026.

Artikel MDKA and EMAS Sign Gold Sales and Purchase Agreement with ANTAM pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Pani Gold Mine Receives Zero Accident Award from Gorontalo Province https://merdekacoppergold.com/en/pani-gold-mine-receives-zero-accident-award-from-gorontalo-province/ Thu, 19 Feb 2026 07:27:35 +0000 https://merdekacoppergold.com/?p=29246 Pani Gold Mine has reaffirmed its commitment to Occupational Health and Safety (OHS) by receiving the Zero Accident Award from the Pemerintah Provinsi Gorontalo on Friday, February 13, 2026. Two subsidiaries of PT Merdeka Gold Resources Tbk that operate Pani Gold Mine received awards in the large company category: PT Gorontalo Sejahtera Mining (GSM) for […]

Artikel Pani Gold Mine Receives Zero Accident Award from Gorontalo Province pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Pani Gold Mine has reaffirmed its commitment to Occupational Health and Safety (OHS) by receiving the Zero Accident Award from the Pemerintah Provinsi Gorontalo on Friday, February 13, 2026.

Two subsidiaries of PT Merdeka Gold Resources Tbk that operate Pani Gold Mine received awards in the large company category: PT Gorontalo Sejahtera Mining (GSM) for achieving 7,666,280 person-hours without a lost time injury, and PT Puncak Emas Tani Sejahtera (PETS) for achieving 2,166,209 person-hours without a lost time injury.

The award was presented by the Governor of Gorontalo Province in recognition of the companies’ achievement in recording zero lost time injuries (LTI), in accordance with Minister of Manpower Regulation No. PER-01/MEN/I/2007. This milestone demonstrates that the consistent implementation of OHS management systems can create a safe, healthy, and productive workplace.

The award was received by Sasongko Heru Nugroho, Head of Mine Technical PETS, accompanied by Adi Firdaus, HR Manager of Pani Gold Mine. “Everyone Safe, Always is our core operational value. This achievement reflects the collective efforts of all employees and partners in upholding safety standards,” said Sasongko. “We remain committed to maintaining and further strengthening OHS standards across all operations.”

Adi said that the achievement reflects strong collaboration in building a safety culture. “This award is not just about numbers, but about our consistency in ensuring every worker returns home safely each day,” said Adi. “We build our safety culture through continuous training, strict supervision, and active engagement of employees and partners.”

This recognition further Pani Gold Mine’s position as a mining operation that prioritizes safety alongside productivity and responsibility to its workforce.

Moving forward, the company will continue enhancing OHS training, operational supervision, and workforce competency to ensure safety remains the foundation as it advances toward full production.

*

Acceptance of the Zero Accident Award by representatives of Pani Gold Mine.

Artikel Pani Gold Mine Receives Zero Accident Award from Gorontalo Province pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
First Gold Pour Marks Official Production Start at Pani Gold Mine https://merdekacoppergold.com/en/first-gold-pour-marks-official-production-start-at-pani-gold-mine/ Wed, 18 Feb 2026 08:06:02 +0000 https://merdekacoppergold.com/?p=29235 Pani Gold Mine officially achieved its first gold pour on Saturday, February 14, 2026, ahead of the original target of the end of the first quarter of 2026. This milestone marks the start of commercial gold production and represents a significant step in the mine’s journey. The open-pit mine, located in Hulawa Village, Pohuwato Regency, […]

Artikel First Gold Pour Marks Official Production Start at Pani Gold Mine pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Pani Gold Mine officially achieved its first gold pour on Saturday, February 14, 2026, ahead of the original target of the end of the first quarter of 2026. This milestone marks the start of commercial gold production and represents a significant step in the mine’s journey.

The open-pit mine, located in Hulawa Village, Pohuwato Regency, Gorontalo, has Gold Ore Reserves containing approximately 4.8 million ounces of gold, part of a Mineral Resource Estimate containing 7.01 million ounces of gold—positions it as one of Indonesia’s most prospective primary gold mines.

Since PT Merdeka Gold Resources Tbk (MGR), the mine operator, was listed on the Bursa Efek Indonesia under the ticker symbol EMAS, development of the Pani Gold Mine has accelerated rapidly. First mining was carried out on October 1, 2025, followed by the completion of the Ore Preparation Plant (OPP) two weeks later.

In the following months, the project reached several key milestones, including first ore crushing at the OPP, first ore stacking at the heap leach facility, and first irrigation, marking the start of the leaching process. The resulting pregnant leach solution was then processed at the Adsorption, Desorption, and Recovery (ADR) plant to extract and refine the gold into doré bullion.

During this initial operational phase, the Pani Gold Mine uses the heap leach method, targeting gold production of approximately 110,000–115,000 ounces in its first year, exceeding the initial 2026 target of 80,000 ounces.

The Pani Gold Mine has also begun construction of its Carbon-in-Leach (CIL) facility, with earthwork underway since early 2026, ahead of the original 2027 schedule. The CIL facility will complement the heap leach, enabling the mine to rely on two processing methods in parallel to optimize gold recovery.

The 12-million-ton-per-year CIL facility is now targeted for completion in 2028, earlier than the original phased plan extending to 2032. Once fully operational, total gold production at the Pani Gold Mine will be derived from a combination of heap leach and CIL processing. With this acceleration, peak production potential of up to 500,000 ounces of gold per year could be achieved by 2029, ahead of previous projections.

“This first gold pour marks a key milestone in EMAS’ successful transition from project development to commercial gold operations. Achieving this ahead of schedule reflects strong project execution discipline and operational readiness,” said Boyke Poerbaya Abidin, President Director of MGR, during the ceremony, which was also attended by Gorontalo Governor Gusnar Ismail and Vice Governor Ida Syahidah. Boyke added that the commencement of operations at the Pani Gold Mine also provides a foundation for further production growth.

In his remarks, Governor Gusnar Ismail expressed confidence that the mining industry will support economic growth in Gorontalo Province. “I am optimistic that with the mining industry, provincial economic growth could exceed 6 percent if managed properly,” he said, noting that current growth stands at 5.71 percent. With strong economic growth, he added, poverty level in the Gorontalo province is also expected to decline.

“In addition to strengthening Merdeka Group’s gold portfolio, the Pani Gold Mine will contribute to Indonesia’s gold production and support Gorontalo’s economic development through job creation and community empowerment programs,” Boyke added. “All our operations are conducted in accordance with Good Mining Practices and high environmental, social, and governance standards.”

*

 

Gold and silver in the form of doré bullion.
A traditional dance welcoming Pohuwato religious leaders, as well as Gorontalo Governor Gusnal Ismail and Vice Governor Idah Syahidah Rusli Habibie.

The first gold pour celebration at the Pani Gold Mine on February 14, 2026.

Main photo: The process of forming gold and silver into doré bullion.

Artikel First Gold Pour Marks Official Production Start at Pani Gold Mine pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Mosehe Wonua Routa: Purifying the Heart and Preserving Tradition in the Land of Konawe https://merdekacoppergold.com/en/mosehe-wonua-routa-purifying-the-heart-and-preserving-tradition-in-the-land-of-konawe/ Mon, 09 Feb 2026 08:50:44 +0000 https://merdekacoppergold.com/?p=29154 The morning sun felt different in Lalomerui Village on Saturday, 7 February 2026. With bright expressions, hundreds of residents from villages across Routa Subdistrict gathered at the village’s proud central field. The day was not an ordinary gathering, but a historic moment. For the first time, the Mosehe Wonua ritual was held in Lalomerui, the […]

Artikel Mosehe Wonua Routa: Purifying the Heart and Preserving Tradition in the Land of Konawe pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
The morning sun felt different in Lalomerui Village on Saturday, 7 February 2026. With bright expressions, hundreds of residents from villages across Routa Subdistrict gathered at the village’s proud central field. The day was not an ordinary gathering, but a historic moment. For the first time, the Mosehe Wonua ritual was held in Lalomerui, the most remote area of Konawe Regency, Southeast Sulawesi.

Mosehe Wonua is a sacred customary ritual of territorial purification practiced by the Tolaki people, one of the ethnic groups of Southeast Sulawesi. The ritual aims to cleanse the self and the land, reconcile conflicts, and ward off misfortune by seeking protection from the Creator so that the region may be spared from harm.

The procession began solemnly with the Pengangkatan Adat, or the formal declaration of the ritual’s intent. Led by the To-ono Mo-tuo, or customary elders, of the Tolaki Customary Council, the ceremony involved the Vice Regent of Konawe, Syamsul Ibrahim, as the respected elder figure. The presence of customary leaders alongside government officials symbolized the harmony between traditional order and formal governance. Also in attendance were representatives of the Konawe Regency DPRD, officials from the regency and Routa Subdistrict governments, and village heads from across Routa.

Following the declaration, the ritual continued with a collective prayer. All participants bowed their heads in reverence. Holding hands or gently touching each other’s shoulders, they prayed together, offering hopes for the safety and well-being of the entire Routa community. The ritual then proceeded with a water-sprinkling procession. Water that had been prayed over was sprinkled onto those present, symbolizing inner purification and the cooling of the soul for every resident of Routa.

The climax of the Mosehe Wonua ritual was marked by the sacrifice of a buffalo. The blood that was shed symbolized atonement and the rejection of misfortune. Through this offering, the community sought to release negative energies and replace them with gratitude for the abundance bestowed upon the land of Routa.

The event was attended not only by residents and government representatives, but also by the private sector. The Head of Mine Technical of PT Sulawesi Cahaya Mineral (SCM), Didik Fotunadi, along with representatives of SCM contractors, took part in the ritual with deep respect, underscoring that industry and tradition can coexist in harmony.

In his remarks, Vice Regent Syamsul Ibrahim emphasized the importance of maintaining harmony between the community and companies operating in the area. “Mosehe Wonua purifies ourselves and our land so that we are kept away from misfortune. This is the first time in Routa’s history that Mosehe Wonua has been held,” he said. “I hope this ritual becomes a momentum to strengthen bonds with local communities, especially in Routa. We must work together to develop this area into a miniature of the most beautiful town in Konawe and Southeast Sulawesi.”

Echoing this sentiment, Routa Urban Village Head Ahmad stated that the collaboration between residents and the company to revive this nearly extinct ritual was a major step toward unity. “This event is sacred and is being held for the first time in Routa. It serves as a forum to unite all Routa residents,” he said. “If disputes arise, we should sit together and involve customary institutions. In Routa, we have always prioritized customary resolution for the sake of peace.”

From the industry perspective, Didik Fotunadi reaffirmed SCM, a subsidiary of PT Merdeka Battery Materials Tbk (IDX: MBMA), commitment to contributing to communities around its mining operations through various economic and infrastructure development programs. “Our contribution to the Mosehe Wonua event reflects our commitment to respecting local wisdom and cultural traditions in the communities surrounding SCM’s mining area in Routa,” he said. “As a ‘neighbour’ in Routa, we also need a safe and conducive environment so that our operations can continue to deliver positive contributions to community welfare. SCM will continue to work in synergy with local government and the community.”

As the ritual concluded and all prayers had been offered, a profound hope lingered on the Lalomerui field: that economic progress would never erode the noble values passed down by Tolaki ancestors. Routa now stands not only spiritually cleansed, but also ready to embrace a more harmonious future.

*

Photos: Antara.

Artikel Mosehe Wonua Routa: Purifying the Heart and Preserving Tradition in the Land of Konawe pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
SCM Provides Free Internet Access for Lalomerui Village in Remote Routa https://merdekacoppergold.com/en/scm-provides-free-internet-access-for-lalomerui-village-in-remote-routa/ Mon, 09 Feb 2026 08:00:43 +0000 https://merdekacoppergold.com/?p=29175 For years, residents of Lalomerui Village have lived with limited access to information. Located in Routa Sub-district, behind hills and forests and more than 300 kilometers from the administrative center of Konawe Regency, digital connectivity was once out of reach. That situation has now changed. Through its SCM Peduli program, PT Sulawesi Cahaya Mineral (SCM) […]

Artikel SCM Provides Free Internet Access for Lalomerui Village in Remote Routa pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
For years, residents of Lalomerui Village have lived with limited access to information. Located in Routa Sub-district, behind hills and forests and more than 300 kilometers from the administrative center of Konawe Regency, digital connectivity was once out of reach. That situation has now changed. Through its SCM Peduli program, PT Sulawesi Cahaya Mineral (SCM) has provided free village internet access to Lalomerui—situated at the northernmost edge of SCM’s mining area—serving the village office as well as local schools, including SMP Negeri 2 Routa and SD Negeri Lalomerui.

The availability of internet access in Lalomerui is the result of collaboration between SCM and PLN Icon Plus, Regional SBU Sulawesi and Eastern Indonesia. Infrastructure development began in early January 2026, starting with the installation of fiber optic cables. PLN Icon Plus supplied poles and network infrastructure from the provincial road junction to Routa Sub-district, while SCM’s IT team ensured distribution reached key facilities throughout the village. With bandwidth capacity of up to 200 Mbps, the connection is designed to be stable and capable of supporting a wide range of activities, from video conferencing to access to government servers—services that were previously difficult to reach from the area.

The most immediate benefits have been felt in the education sector. Prior to the installation, teachers at SD Negeri Lalomerui and SMP Negeri 2 Routa had to travel for hours to the regency capital simply to submit administrative reports and update the national Education Data System (Dapodik) online.

The principal of SMP Negeri 2 Routa, Imran, described the internet access as a turning point for teaching and learning. “For the past several years, our digital learning materials were practically unusable because they required access to central servers. With free Wi-Fi now available, learning resources can be accessed easily,” he said. “We believe this will significantly boost students’ motivation to learn.”

Internet access has also improved efficiency in school operations. Previously, students of SMP Negeri 2 Routa had to travel to the regency capital to take national assessments. This year, the school is proud to be able to conduct the National Assessment independently on its own campus.

Village Head of Lalomerui, Taksir Unggahi, expressed hope that the facility would broaden local perspectives and open new economic opportunities. “We hope this internet access brings new knowledge to communities around the mining area, including ways to develop the village economy through digital platforms,” he said.

Despite the many benefits, SCM also emphasized the importance of responsible use of technology. During the official handover ceremony of the Village Internet Facility held at SCM’s Community Affairs Office in Lalomerui on 4 February 2026, SCM’s Head of Mine Technical , Didik Fotunadi, reminded the community that the internet has two sides. “Internet technology is like a double-edged sword. It shortens distances, but it also exposes users—especially children—to outside influences if not properly supervised,” he said. “We entrust this facility to be safeguarded and used positively, with guidance from teachers and parents.”

Following the signing of the handover documents, representatives of SCM management, together with its parent company PT Merdeka Battery Materials Tbk and the PLN Icon Plus team, visited beneficiary locations including the Lalomerui Village Office, SMP Negeri 2 Routa, and SD Negeri Lalomerui. Technical teams checked signal strength and ensured routers and cable installations met safety standards and were ready for sustainable operation. The visit was also attended by teachers from SD Negeri Lalomerui led by Ramlin, S.Pd., and local community leaders.

With the operation of this free internet service, Lalomerui Village has officially entered the digital era. The initiative demonstrates that geographical constraints are no longer a barrier to access to technology—and that collaborative efforts can bring meaningful change to classrooms hidden behind hills and forests in remote areas of Konawe.

Photos: Handover of free village internet access from SCM to beneficiary institutions and communities.

Main photo: View of Lalomerui Village.

 

 

Artikel SCM Provides Free Internet Access for Lalomerui Village in Remote Routa pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Flood Mitigation Efforts, BSI Supports the Normalization of the Roworejo River in Sumberagung https://merdekacoppergold.com/en/flood-mitigation-efforts-bsi-supports-the-normalization-of-the-roworejo-river-in-sumberagung/ Fri, 30 Jan 2026 08:05:27 +0000 https://merdekacoppergold.com/?p=29131 The Roworejo area in Dusun Pancer has long been known as a flood-prone zone. The Roworejo River that runs through the hamlet has become increasingly shallow and is heavily overgrown with water hyacinth, which obstructs the flow of water. During heavy rainfall, the river frequently overflows, inundating residential areas and damaging residents’ farmland. The Roworejo […]

Artikel Flood Mitigation Efforts, BSI Supports the Normalization of the Roworejo River in Sumberagung pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
The Roworejo area in Dusun Pancer has long been known as a flood-prone zone. The Roworejo River that runs through the hamlet has become increasingly shallow and is heavily overgrown with water hyacinth, which obstructs the flow of water. During heavy rainfall, the river frequently overflows, inundating residential areas and damaging residents’ farmland.

The Roworejo River is located not far from the Tujuh Bukit Gold Mine operated by PT Bumi Suksesindo (BSI). Both are situated in Sumberagung Village, Pesanggaran Subdistrict, Banyuwangi, East Java. When the Sumberagung Village Government initiated the normalization of the Roworejo River to reduce flood risks, the subsidiary of PT Merdeka Copper Gold Tbk provided support by covering the cost of excavator operations.

The river normalization work began on Saturday, 24 January 2026, targeting a one-kilometer stretch of the river. The process has been directly monitored by the Head of Pancer Hamlet, Estu Raharjo. Improved water flow following the normalization is expected to reduce flood risks. According to Estu, the effort is also crucial to protecting local livelihoods. “Our farmers depend heavily on their crops. When flooding occurs, plants are damaged and they suffer losses,” he said.

The excavator deployed on site has also been used for other community needs, such as creating household waste disposal pits to prevent rubbish from being carried into the river during the rainy season.

BSI’s support for river normalization in Sumberagung Village is not without precedent. In 2019, BSI was involved in the normalization of the Gonggo River, which had previously overflowed frequently, flooding residential areas, damaging farmland, and leaving large amounts of waste behind. After the river was dredged and the removed sediment was used to build embankments, areas that had experienced flooding up to three times a year were no longer affected.

Support for the normalization of the Roworejo River forms part of BSI’s ongoing involvement in environmental management around its mining operations. Through cooperation with the village government and local communities, flood mitigation efforts are expected to be carried out more effectively and deliver tangible benefits for the residents of Sumberagung.

Artikel Flood Mitigation Efforts, BSI Supports the Normalization of the Roworejo River in Sumberagung pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Heap Leach Irrigation Commences, Pani Gold Mine Moves Toward First Gold Production https://merdekacoppergold.com/en/heap-leach-irrigation-commences-pani-gold-mine-moves-toward-first-gold-production/ Wed, 28 Jan 2026 07:36:46 +0000 https://merdekacoppergold.com/?p=29121 The development of the Pani Gold Mine in Pohuwato Regency, Gorontalo, has entered a critical phase toward the realization of its first gold production. On 27 January 2026, heap leach pad irrigation commenced at the site, marking one of the final stages in the initial production process, with first gold production targeted for the first […]

Artikel Heap Leach Irrigation Commences, Pani Gold Mine Moves Toward First Gold Production pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
The development of the Pani Gold Mine in Pohuwato Regency, Gorontalo, has entered a critical phase toward the realization of its first gold production. On 27 January 2026, heap leach pad irrigation commenced at the site, marking one of the final stages in the initial production process, with first gold production targeted for the first quarter of 2026.

The Pani Gold Mine is a strategic project of PT Merdeka Gold Resources Tbk, a subsidiary of PT Merdeka Copper Gold Tbk. As part of the Merdeka Group, the development of the Pani Gold Mine draws on the Group’s experience in operating the Tujuh Bukit Gold Mine in Banyuwangi, East Java, which applies a similar processing method. This experience provides a strong foundation for technical planning, facility development, and the implementation of operational and sustainability standards at the Pani Gold Mine.

During the initial production stage, the Pani Gold Mine applies the heap leach method, whereby crushed gold ore is stacked on a heap leach pad and irrigated with a chemical solution to dissolve gold and silver from the ore. The resulting pregnant leach solution is then transferred to the ADR Plant (Adsorption, Desorption, and Recovery) for extraction and refining processes, producing gold and silver in the form of dore bullion. The Pani Gold Mine ADR facility has completed its commissioning phase and is ready to process pregnant leach solution.

President Director of PT Merdeka Gold Resources Tbk, Boyke Poerbaya Abidin, stated that the commencement of heap leach irrigation underscores the project’s readiness to achieve its first gold production target.

“This project is not only expected to drive long-term value for investors, but also to make a tangible contribution to regional development, particularly for communities in Pohuwato Regency, through increased local government revenue, job creation, and the development of local MSMEs,” said Boyke.

Alongside the operation of the heap leach facility, the Pani Gold Mine continues to advance the development of a downstream Carbon-in-Leach (CIL) processing facility as part of its medium- to long-term production capacity growth strategy. A Feasibility Study, targeted for completion in the first quarter of 2026, is currently being prepared based on a planned CIL processing capacity of 12 million tonnes per year, to be constructed and operated at full capacity from the outset. This approach replaces the previous plan, which envisaged starting operations at a capacity of 7.5 million tonnes before gradually ramping up to 12 million tonnes.

From a resource perspective, the Pani Gold Mine holds approximately 4.8 million ounces of gold Ore Reserves, derived from a Mineral Resource Estimate of more than 7 million ounces of gold. With this scale, the Pani Gold Mine is recognized as one of the largest primary gold deposits in Indonesia. Through the optimization of heap leach operations and the development of a large-scale CIL facility, the Pani Gold Mine has the potential to reach peak production exceeding 500,000 ounces of gold per year, positioning it as one of the largest gold mines in Indonesia and the Asia-Pacific region.

 

Artikel Heap Leach Irrigation Commences, Pani Gold Mine Moves Toward First Gold Production pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
GSM’s Watershed Rehabilitation Reaches 1,089.37 Hectares, Beyond Regulatory Requirements https://merdekacoppergold.com/en/gsms-watershed-rehabilitation-reaches-1089-37-hectares-beyond-regulatory-requirements/ Mon, 19 Jan 2026 08:27:54 +0000 https://merdekacoppergold.com/?p=29109 An area of 589.37 hectares that has been fully rehabilitated was officially handed over by PT Gorontalo Sejahtera Mining (GSM) to the Ministry of Forestry on Thursday, January 15, 2026, at the Manggala Wanabakti Building in Jakarta. This handover represents the company’s commitment under the Watershed Rehabilitation (Rehab DAS) program. The handover continues the first […]

Artikel GSM’s Watershed Rehabilitation Reaches 1,089.37 Hectares, Beyond Regulatory Requirements pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
An area of 589.37 hectares that has been fully rehabilitated was officially handed over by PT Gorontalo Sejahtera Mining (GSM) to the Ministry of Forestry on Thursday, January 15, 2026, at the Manggala Wanabakti Building in Jakarta. This handover represents the company’s commitment under the Watershed Rehabilitation (Rehab DAS) program.

The handover continues the first phase of rehabilitation covering 500 hectares that had been delivered earlier. With this second phase, the total rehabilitated area submitted by GSM now reaches 1,089.37 hectares. This exceeds the company’s forest-use permit obligation (PPKH) of 999.90 hectares by 89.47 hectares.

The handover documents were signed by GSM Director Cahyono Seto and received by Ir. Sri Handayaningsih, M.Sc, Director of Soil Conservation and Forest Reclamation (TKTRH), representing the Directorate General of Watershed Management and Forest Rehabilitation (PDASRH) of the Ministry of Forestry.

The rehabilitation sites are located in Suka Damai and Wonggasari Tengah villages, Lemito District, Pohuwato Regency, Gorontalo Province. Planting was carried out in two phases: the first from 2018 to 2022, and the second starting in 2022 and evaluated on November 12, 2025.

The evaluation results show a planting success rate of 83.09 percent, surpassing the Ministry’s minimum standard of 75 percent. The planted species include timber trees such as mahogany, nyatoh, and white teak, along with fruit trees like durian, cashew, clove, nutmeg, and rambutan.

Watershed Rehabilitation is a government-mandated effort to restore forest and watershed functions as compensation for forest areas used for business activities. Under the PPKH mechanism, each hectare of forest utilized must be replaced with rehabilitation on another hectare of land. This ensures ecological balance, soil and water conservation, and long-term environmental sustainability.

For GSM, the watershed rehabilitation program reflects the company’s environmental responsibility. “This watershed rehabilitation not only fulfills our regulatory obligations, but also delivers real benefits for the environment and surrounding communities,” said GSM Director Cahyono Seto. “We want to ensure that forest areas remain productive and sustainable.”

GSM is one of the permit holders for the Pani Gold Mine in Pohuwato, Gorontalo, alongside several other companies involved in its management. GSM is a subsidiary of PT Merdeka Gold Resources Tbk (MGR), which in turn is part of the PT Merdeka Copper Gold Tbk. With the completion of this second-phase handover, GSM has now fulfilled its entire watershed rehabilitation obligation.

*

Handover of GSM’s watershed rehabilitation planting in Jakarta, January 15, 2026.
Evaluation of GSM’s watershed rehabilitation planting success, November 12, 2025.

Artikel GSM’s Watershed Rehabilitation Reaches 1,089.37 Hectares, Beyond Regulatory Requirements pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Bumi Suksesindo Receives OHS Award from the Governor of East Java https://merdekacoppergold.com/en/bumi-suksesindo-receives-ohs-award-from-the-governor-of-east-java/ Thu, 15 Jan 2026 04:33:02 +0000 https://merdekacoppergold.com/?p=29099 Early 2026 was marked by an important milestone for PT Bumi Suksesindo (BSI). The subsidiary of PT Merdeka Copper Gold Tbk, which operate a mine in Banyuwangi, received an Occupational Health and Safety (OHS) award from the East Java Provincial Government. The award was presented by Governor Khofifah Indar Parawansa during the National OHS Month […]

Artikel Bumi Suksesindo Receives OHS Award from the Governor of East Java pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>
Early 2026 was marked by an important milestone for PT Bumi Suksesindo (BSI). The subsidiary of PT Merdeka Copper Gold Tbk, which operate a mine in Banyuwangi, received an Occupational Health and Safety (OHS) award from the East Java Provincial Government. The award was presented by Governor Khofifah Indar Parawansa during the National OHS Month ceremony at Tri Dharma Petrokimia Gresik Stadium on Wednesday, 14 January 2026.

According to Roelly Fransza, General Manager of Operations and Head of Mining Engineering at BSI, the award reflects the discipline and commitment of all BSI employees in implementing OHS across all operational activities, both at the Tujuh Bukit Gold Mine and the Tujuh Bukit Copper Project, which together form the Tujuh Bukit Operations (TBO).

Throughout 2025, BSI recorded 19.7 million work hours with zero lost time injuries and zero recordable injuries. This means no incidents occurred that required official reporting under mining safety standards.

This performance was further reinforced by a low Serious Potential Incident Frequency Rate (SPIFR) of 0.37—well below the target of <1.47. It demonstrates the company’s strong ability to manage major risks through effective systems, supervision, and disciplined work practices.

These achievements were previously announced during BSI’s National OHS Month ceremony at its operations site on 12 January 2026, two days before the provincial award was received. The 2026 National OHS Month program includes a series of strategic, promotional, and implementation-based activities, such as health webinars, BSI Fun Run, OHS Reflection Day, and the Internal Rescue Challenge.

“No production target is more important than human life,” said Roelly during the ceremony. He emphasized that everyone deserves to return home safely and in good health after work.

In 2026, BSI aims to take its OHS implementation to the next level under the theme On to the Next Level. The company has embedded Safety Beliefs and Duty of Care into its safety management system to further strengthen a safety-driven culture.

With a strong OHS foundation and continued commitment, BSI is determined to ensure that every worker at Tujuh Bukit Operations can work and return home safely.

Artikel Bumi Suksesindo Receives OHS Award from the Governor of East Java pertama kali tampil pada PT Merdeka Copper Gold Tbk.

]]>